What Is a Change of Use Building Permit?

Same building, new rules

Turning a warehouse into a gym, a shop into a cafe or a house into a medical clinic? You’ll usually need a change of use building permit, because the building has to suit its new use, not just the one it was approved for. That can mean new exits, fire services, toilets or access for people with disability.

Our building surveyors help business owners, landlords, tenants and buyers understand what a new use involves before they sign, then issue the building permit and see the project through to the occupancy permit.

Cafe interior with timber tables, bar stools and pendant lights

Why Does a Change of Building Classification Matter?

The National Construction Code (NCC) classifies each building, or part of one, by its use. The class reflects who’s inside, how many people there are and how easily they can escape in an emergency, so a change of building classification can bring different rules. Common examples:

  • Warehouse to gym: Class 7b, for wholesale storage or display of goods, to what is often Class 9b, an assembly building for sport or recreation.
  • House to office or clinic: Class 1a, a single dwelling, to Class 5, for professional or commercial purposes. A clinic where the main treatment leaves patients non-ambulatory is Class 9a, a health-care building.
  • Office to childcare centre: Class 5 to Class 9b, which includes early childhood centres.
  • Storage to manufacturing: Class 7b to Class 8, where goods are processed.
  • Shop to cafe: both Class 6, but the new use can still change what the building needs.

What Does Victorian Law Say About Change of Use?

Building and Plumbing Commission (BPC) guidance notes that section 40 of the Building Act 1993 and regulation 229 of the Building Regulations 2018 prohibit using a building for a purpose other than what has been approved. Regulation 230 lets a private building surveyor, such as JLN, exercise the municipal building surveyor’s functions under regulation 229.

Your building surveyor assesses the building against the requirements for the new use and advises what needs upgrading. Any upgrade work needs a building permit unless it is exempt, so it pays to know the scope before you commit.

Occupancy Permits for a Change of Use

Your building permit will state whether an occupancy permit is required. If it is, the building must not be occupied until it’s issued. Regulation 185 exempts only limited work, such as work on a shed or other Class 10 building, alterations to a house and alterations within an apartment.

The occupancy permit reflects the building’s classifications and approved uses. For Class 1b, 2, 3 and 5 to 9 buildings, it must also list the essential safety measures, their required performance and how often each must be inspected, tested and maintained.

How Does the Change of Use Permit Process Work?

A change of use runs smoothest when the building questions are answered first, so we show you what the new use needs before you spend money on a lease, purchase, fit-out or equipment.

Tell us the plan

Send the address, the current use and any occupancy permit, the proposed use, opening hours, likely staff and visitor numbers and a floor plan or sketch. We’ll quote and flag the big questions early.

Classification and upgrades

We confirm the current and proposed NCC classification, inspect the building if needed and advise what the new use requires, from exits and fire services to access, toilets and structure.

Building permit issued

Your designer and consultants prepare the drawings and reports. Once they comply and any required planning permit has been obtained, we issue the building permit and the upgrade work can start.

Inspections and occupancy

We carry out the mandatory inspections on your permit, then complete the final inspection and issue your occupancy permit or certificate of final inspection, listing the essential safety measures the owner must maintain.

What Upgrades Can a Change of Use Trigger?

What’s needed depends on the building, the new classification and how many people will use it. Common upgrade areas include:

  • Fire safety: exits, exit signs and emergency lighting, smoke detection, sprinklers and hydrants, and fire separation where different uses share a building.
  • Access: new work must meet the Disability (Access to Premises – Buildings) Standards 2010, which can also require upgrades to the principal pedestrian entrance and the accessible path to the new work.
  • Sanitary facilities: more people, or a different use, can change how many toilets, basins and accessible facilities are needed.
  • Structure: a floor designed for a house or office may not suit gym equipment, racking or heavy storage, so an engineer may need to check it.
  • Energy efficiency: new lighting, air-conditioning and building fabric may need to meet the NCC’s energy efficiency provisions.

Does a Change of Use Need a Planning Permit?

That’s a separate question, answered by your council’s planning scheme. Each zone has a table of uses: some uses need no planning permit, some need one and some are prohibited, and a use that doesn’t meet a listed condition moves into a more restrictive category. In some zones both the new use and the works need a permit; in others, only the works may. Car parking and signage provisions can also apply.

A required planning permit must be obtained before the building permit is issued. Our guide to building permits vs planning permits explains how they fit together.

What Must Owners Maintain After the Change?

After the change, the owner must keep each essential safety measure, such as exit signs, emergency lighting, fire detection and sprinklers, maintained so it operates satisfactorily. Under Part 15 of the Building Regulations 2018, the owner must also prepare an annual essential safety measures report, and can authorise an agent, such as a maintenance contractor, to complete it.

Records must be made available to council or the fire authority on request, after 24 hours’ notice, and occupiers must keep exits and paths of travel clear. Fines can apply. The BPC’s essential safety measures guide explains each obligation.

Why Choose JLN for Your Change of Use Permit?

JLN Building Consultants is a building surveying consultancy based in Niddrie, in Melbourne’s north-west, working across Melbourne and regional Victoria. Our directors have over 20 years of combined experience in construction and building surveying, and our commercial building permit work spans warehouses, offices, shops, cafes, restaurants, schools and childcare centres.

  • Due diligence advice before you sign a lease or buy.
  • Clear answers on classification, fire safety, access and essential safety measures.
  • Building permits, inspections and occupancy permits from one team.
  • Maximum Patron Capacity Reports and fire safety audits.

Talk to us before the new use starts, while the plan can still change.

Frequently Asked Questions

Common questions from owners, tenants and buyers planning a change of use.

Do I need a building permit for a change of use?

Usually. Preparing a building for a new use generally involves building work, such as new exits, fire services, toilets or access upgrades, which needs a permit unless an exemption applies. Even if little work seems necessary, speak to a building surveyor first, because using a building for an unapproved purpose is prohibited.

Is a shop to cafe conversion a change of use?

It can be, even though shops, cafes and restaurants are all Class 6 under the NCC. Seating, a commercial kitchen and more customers can change what the building needs, including exits and toilets, and the zone determines whether the new use needs a planning permit. See our fit-out permits page for the building work.

Can I open before the occupancy permit is issued?

Not if your building permit requires an occupancy permit. The building must not be occupied until it’s issued, so allow for the final inspection in your fit-out program and lease dates, and have your trades’ certificates ready. If no occupancy permit is required, the work is signed off with a certificate of final inspection.

What should I check before signing a lease or buying?

Ask for the current occupancy permit, the latest annual essential safety measures report and any planning permit, and check whether the new use needs a planning permit in that zone. Then have a building surveyor review the building against the new use, and agree in writing who pays for upgrades. Our due diligence advice covers these steps.

Will I need a Maximum Patron Capacity Report?

If the new use needs a liquor licence, such as for a cafe, restaurant or bar, a Maximum Patron Capacity Report can support your application. We prepare these reports, assessing floor area, exits and egress, and it’s worth arranging one alongside the change of use because the same building features affect both.